Church of the Annunciation
BUILDINGS AND GROUNDS COMMITTEE
MINUTES November 12, 2025
In Attendance:
Larry Komendat Dawn Cahill Janet Faulhaber
Bill Markowski John Neidhart
The meeting convened at 9 AM in the meeting room in Selbert Hall and began with a prayer.
Minutes from the October 14, 2025 meeting were accepted.
Old Business:
1. Quotes were secured to replace the concrete pad and steps behind the rectory. Lakeside
Concrete was the low bidder for the contract at $4,838.00. The job is currently on hold.
2. Replacement of the original pneumatic controls of the heating/air conditioning system in the
church have begun. Trane is also programming, testing and calibrating the new equipment.
New Business:
From Bill Markowski:
The temperature controls in the church were completed today. (Dec. 3rd) Program updates were made,new equipment tested and calibrated, and everything checked out with Trane.
I worked on removing all old pneumatic controls and disconnected the compressor today. The compressor can be hauled out. Not sure if maintenance wants it or we scrap it. Remaining work includes removing the air dryer and the large pneumatic control panel, which I would need help with. No hurry on these. 120 volt power and pneumatic lines are disconnected from both. I have a little clean up left to do in the space and then the project is complete.
When checking the 6 cabinet heaters in the church entrances, usher room, and library, we found a bad fan motor in the west entrance unit near Schwartz Rd. That entrance is always cold with a west wind blowing in, so this heater is important. Trane started the unit to test it and had sparks and smoke coming from the motor and it tripped the circuit breaker. I will open it up on my next visit and get a model number then shop a price for a replacement.
Future Improvements to the Pavilion & Storage Building:
Future Projects:
parlor. Catch basin to drain the lot to Clinton St. will be included. Engineer Tim Lavocat has
been hired to prepare a drawing for bid purposes and for the New York State permit to drain
the parking lot to the Clinton St. storm drain. This project is currently on hold. Cold patch was
applied by the Joseph Workers. We also suggest having the snow plow contractor keep the
2024. parking lot clear at the crosswalk by the signal light.
2. Rectory roof- in the next 5 years.
3. Replacement of the school boiler control panel. A recent repair to the control panel was
done by MJ Mechanical. They advised us that parts are no longer available for the Johnson
Control panel. We will request a quote for replacement using Trane equipment.
Meeting adjourned at 10:30 AM
Next meeting:
Tuesday, December 16, 2025 at 10 AM in the meeting room in the Selbert Hall meeting room.